1. Concrete hollow block machine should be installed on concrete ground and fixed by ground screw.
2. After installing automatic Block Machine, please check all screws is tightened or not
3. Connect electricity power
4. all moving parts of Block Machine is lubricated well and all gear boxs are with lubrication oil.
5. All are ok. Then concrete block machine can test without raw material. After test, it can work normally